Ignou Management MS-05 Assignments 2015

Written By -

Ignou Management MS-05 Assignments 2015 - All students can download here Assignments of Indira Gandhi National Open University (IGNOU) Master of Business Administration (MBA) Management of Machines and Materials (MS-05)  first semester for academic session January 2015 & July 2015.

The following are the last dates for Submission of your assignments to the coordinator of your study centre.

First Semester : 30th April

Second Semester : 31st October

Attempt all the questions and submit this assignment on or before 30th April, 2015 to the coordinator of your study center.

Course Code : MS - 05
Course Title : Management of Machines and Materials
Assignment Code : MS-05/TMA/SEM-I/2015
Coverage : All Blocks

✓ Explain in detail the framework of planning, organizing and control decisions in production systems. Give suitable examples to explain the framework.

✓ What are the major techniques of work measurement? Discuss two important techniques with suitable examples.

✓ Under what circumstances would you use PERT as opposed to CPM in project management? Give some example of projects where each would be more applicable than the other.

✓ Explain the basic concept of value engineering. Choose any product, system or procedure that you are conversant with and apply the value tests to find out if there is a scope for value improvement in it.

✓ Explain the following in brief:

a. Systematic waste reduction procedure
b. Wastivity Indices
c. Gross Wastivity
d. Taxonomy of waste


Blog, Updated at: 9:03 AM

0 comments:

Post a Comment

IGNOU SOLVED ASSIGNMENT

DOWNLOAD DATE SHEET

CHECK ONLINE GRADE CARD

REVALUATION RESULTS

IGNOU QUESTION PAPERS

Powered by Blogger.